Our Pledge
We will deliver a complete, end-to-end solution with a single point of responsibility. Our core expertise is in building and integrating Command Centers and Control Rooms of all types. We execute projects worldwide, in-theatre or otherwise. We have extensive experience in the Middle East, Europe, and the Pacific, bringing the same level of acumen and attention to detail to every project regardless of the location.
PROVEN EXPERIENCE & PAST PERFORMANCE

USEUCOM | Joint Operations Center (JOC) and Senior Decision Cell (SDC) Patch Barracks, Stuttgart, Germany

C³EL was tasked with replacing two aging large projector systems in the United States European Command (USEUCOM), Headquarters Joint Operations Center (JOC), and the Senior Decision Cell (SDC) with two new Leyard DirectLight 2 LED Video Wall Systems. In addition to the design and integration of both LED walls and new video processors, the scope included the demolition, and engineering, and construction of a new wall that would support the new JOC video wall. Our team deployed C³EL technicians and one of our master programmers to Stuttgart, Germany to fully integrate the video walls in the existing complex A/V system. The USEUCOM JOC installation was the largest Leyard DirectLight 2 LED Video Wall system integration to date in the DoD.
The project was successfully completed on time and on budget.

USCENTCOM Headquarters and Foward AV/VTC Modernization | Al Udeid Air Base, Doha, Qatar
C³EL delivered a turnkey AV solution for USCENTCOM Headquarters Joint Operations Center (JOC) and Main Conference Room (MCR) located in Tampa, FL. Subsequently, our team was contracted to conduct a site survey for the USCENTCOM Forward Headquarters (CFH) at Al Udeid Air Base, Qatar.
Our team was awarded the contract to fully modernize all AV systems in the 200,00 square foot headquarters, by upgrading the Commander's Briefing Room, Main Conference Room, multiple operations centers, executive conference rooms, media centers, and telecom rooms. C³EL developed a Project Management Plan that included multiple phases at various geographical locations.
Our team designed, built, and pre-configured over 150 racks of equipment at our Tampa, FL integration facility. Our logistics team successfully coordinated the international secure shipment of all equipment to the AOR for deployment. This project encompassed every aspect and discipline of AV systems integration and directly enhanced the COCOM's capabilities to support the war-fighter. C³EL successfully executed according to our project schedule and proposed budget.

USSOCOM War Gaming Center (WGC) Command Center Integration | MacDill AFB, Tampa, Florida
.jpg)
C³EL designed and built the A/V and VTC systems for the SOCOM Alternate War Gaming Center (WGC). The WGC is a 1,500 square foot room, with four high-definition (HD) projectors and twelve 65-inch LCD screens.
Our team implemented a custom Crestron program, a custom BIAMP DaVinci user interface for the audio system, and a digital signage encoder server with ten DMA receivers.
We also installed a video recording suite, automated lighting, and a custom laser highlighting system to support this project.